- discussion of the possible scope of work offered by our company
- determining the investor`s needs
- determining initial investment budget
- project valuation inventory
2.
stocktaking
- three-dimensional, digital reflection of reality thanks to the use of the most modern and error-free measurement technique - LEICA 3D disto Geosystem.
3.
concept
- ergonomic and functional analysis of the premises layout
- climate proposal in accordance with the investor`s aesthetic preferences
- 2D drawings with various arrangement options, including floor plans with various proposals for partition walls, furniture arrangements, equipment and sanitary facilities
- 3d model of the version selected and discussed in detail
4.
material selection
- determining colour and stylistic preferences based on preliminary budget assumptions
- selection of materials starting from floors, through tiles, furniture components, wall finishing
- meeting at our office
- selection of equipment such as fittings, ceramics, lighting, door handles, finished furniture, window decorations etc.
- proposal of all materials and devices present in the project - photorealistic visualization
5.
visualization
- presentation of the interior and its character using photorealistic visualizations
- using the most advanced software showing interiors before their implementation and illustrating previous design, material, colour and budget assumptions
6.
technical documentation
- making a set of architectural drawings and interior views needed to complete the project along with industry drawings if they turn out to be necessary (construction, air conditioning and others)
- solution of all unusual details appearing in the project
- list of finishing materials and equipment together with prices
7.
pricing and schedule
- preparing a complete valuation of construction works, furniture, finishing materials and equipment
- preparing a work schedule with delivery and completion deadlines
- coordination of deadlines for all construction and finishing teams
8.
ordering, storage and delivery of materials
- ordering all components of the equipment with appropriate time in advance
- storing and checking materials in terms of quality and compliance with the project
- timely delivery of all components on construction site
9.
other construction works
- performance of all construction works included in the project in cooperation with proven construction teams
- our guarantee of compliance of the work carried out with the design and building standards furniture production
10.
production
- creating a virtual furniture model with all details in the IMOS software
- VR checking of every piece of furniture in terms of dimensional compliance with reality thanks to LEICA 3D disto Geosystem measurements.
- cutting out and further preparation of the furniture for production using the most modern CNC device that provides unprecedented precision
- varnishing, packaging and transport under the supervision of a person coordinating
11.
the project assembly
- coordination and performance of all assemblies:
- wooden floors, carpets
- furniture developments and finished furniture
- stairs of different types with balustrades
- doors and liners
- developments and glass structures
- window decorations, including blinds, curtains, shades
- other components included in design
12.
final acceptance
- handing over complete implementation in accordance with the project